• 3 minutes e-car sales collapse
  • 6 minutes America Is Exceptional in Its Political Divide
  • 11 minutes Perovskites, a ‘dirt cheap’ alternative to silicon, just got a lot more efficient
  • 45 mins GREEN NEW DEAL = BLIZZARD OF LIES
  • 2 days Hydrogen balloon still deflating
  • 3 days Renewables are expensive
  • 8 days Bad news for e-cars keeps coming
  • 10 days More bad news for renewables and hydrogen
  • 5 hours EVs way more expensive to drive
  • 2 days How Far Have We Really Gotten With Alternative Energy
  • 5 days EV future has been postponed
  • 7 days The (Necessarily Incomplete, Inarguably Ridiculous) List of Things "Caused by Climate Change" - By James Corbett of The CorbettReport.com
  • 40 days Green Energy's dirty secrets

Saudi Aramco Awards $2 Billion Deal for Offshore Field Expansion

Saudi Aramco has awarded a $2-billion contract to Saipem as part of the capacity expansion of the huge Marjan offshore field in Saudi Arabia, the Italian engineering group said in a statement.

The new contract is part of an existing long-term agreement between Saipem and the world’s largest oil company.

Saipem’s scope of work involves the engineering, procurement, construction and installation of wellhead platforms’ topsides, wellhead platforms’ jackets, tie-in platform jacket and topside, rigid flowlines, submarine composite cables, and fiber optic cables.

This is the second contract the Italian group has won with Saudi Aramco this month.

In early September, Saipem was awarded two contracts worth a total of $1 billion to install jackets, Production Deck Modules, pipelines, and subsea power cables at the Marjan, Zuluf, and Safaniyah oil fields in Saudi Arabia.

Aramco was instructed early this year by the Kingdom’s leadership to stop work on expanding its maximum sustainable capacity to 13 million barrels per day (bpd), instead keeping it at 12 million bpd.

Despite the reversal of the capacity increase policy, Saudi Aramco continues work to expand crude capacity production at several fields, including the Marjan, Berri, Dammam, and Zuluf crude increment projects.

In its half-year report last month, Saudi Aramco said that it continues to work on projects to maintain its 12 million bpd maximum sustainable capacity and preserve operational flexibility.

ADVERTISEMENT

The Dammam development project, which is expected to add crude oil production of 25,000 bpd later this year and 50,000 bpd in 2027, progressed construction. The Marjan and Berri crude oil increments, which are expected to add production capacity of 300,000 bpd and 250,000 bpd, respectively, by 2025, continued with procurement and construction activities. Finally, the Zuluf crude oil increment, which is expected to provide a central facility to process a total of 600,000 bpd of crude oil from the Zuluf field by 2026, moved forward with engineering, procurement, and construction activities.

By Tsvetana Paraskova for Oilprice.com

More Top Reads From Oilprice.com



Join the discussion | Back to homepage



Leave a comment

Leave a comment

EXXON Mobil -0.35
Open57.81 Trading Vol.6.96M Previous Vol.241.7B
BUY 57.15
Sell 57.00
Oilprice - The No. 1 Source for Oil & Energy News